                       Table 7  Estimated Flows and Ratios in Iteration 1 of the Example
                 facility j  scale level k  Budget   z(y)=z' (y)     Ratio(j,k|y)=Ratio' (j,k|y)

                    1            1        Enough         8                     4
                                                                               5
                    1            2        Enough         15                    3
                                                                               14

                    2            1        Enough         4                     4
                                                                               35
                    2            2        Enough         8                     4
                                                                               25

                    3            1        Enough         10                    1

                    3            2        Enough         19                    19
                                                                               60



                       Table 8  Estimated Flows and Ratios in Iteration 2 of the Example

                 facility j  scale level k  Budget   z(y)=z' (y)     Ratio(j,k|y)=Ratio' (j,k|y)
                    1            1        Enough         18                    4
                                                                               5

                    1            2          Not          –                     –

                    2            1        Enough         14                    4
                                                                               35

                    2            2        Enough         16                    3
                                                                               25



                       Table 9  Estimated Flows and Ratios in Iteration 3 of the Example
                 facility j  scale level k  Budget  z (y)  z' (y)  Ratio(j,k|y)   Ratio' (j,k|y)

                    2           1         Enough    22     25          4               1
                                                                       35              5
                    2           2         Enough    24     27          3               9
                                                                       25             50


                   At the end of the third iteration, for using GSAMFE algorithm, we add facility 2 with
               scale level 1 into our construction plan since Ratio' (2,2|y) is the highest one. However,

               we find that if we apply GSAMF algorithm, we will choose facility 2 with scale level 2
               instead of scale level 1 since we use Ratio (j,k|y) instead of Ratio' (j,k|y).